Case Study: GIS
BHP BILLITON IRON ORE PTY LTD
Stormwater run-off models for Nelson Point & Finucane Island Irion Ore handling & port facilities, Pilbara Coast, Western Australia
A stormwater run-off model was developed for the Nelson Point iron ore handling & port facilities, to model sediment and potential contaminant loadings from the site into the Port Hedland harbour area.
Drainage catchments identified by BHPB were overlain by site geology and cut/fill plans to allow run-off coefficients to be allocated, using Geographical Information System (GIS) software.
Evaporative loss was modelled based on published pan Et figures occuring during the storm duration.
Intensity-frequency-duration (IFD) run-off events were also modelled.
The model was calibrated against observed flow data recorded during historic storm events.
A similar run-off model was also developed for the Finucane Island ore handling facility.
Run-off catchments were defined from high-resolution aerial photography and a 0.5m digital elevation model. Catchments & discharge points were verified by ground-truthing.
Sediment and contaminant loadings from individual catchments flowing to specific discharge points can be estimated from current and historic rainfall/ intensity events.
Stuart Jeffries
Hydrosolutions Pty Ltd
Click here to see a project summary
Click here for details of our capabilities in GIS
Click here to send us details of your requirements
Click here for other example GIS projects
GIS3